In the winter of 2020, PA Costa Brava took care of the complete renovation of the swimming pool, during which all pipes were replaced, the pump and sand filter were replaced, 2 new skimmers were installed, and a heat pump for the swimming pool water was installed. Together with an insulated cover, this ensures that swimming is also possible in the spring and autumn with a water temperature of 27-30 degrees. Furthermore, a concrete floor has been poured around the pool on which natural stone has been laid. The house has been painted, and an automatic irrigation system is currently being installed in the garden to ensure that the newly sown grass looks beautiful. All in all, another enjoyable job with a very beautiful result.